Seletar West Road 3, Sengkang West · B2 IndustrialStrata Industrial For Sale
Sengkang Connection B2 industrial development logo

Financing Tools

Industrial Purchase Calculator

Estimate GST, stamp duty, cash outlay and the progressive payment schedule for an industrial BUC purchase.

This calculator estimates the full cost of buying an industrial unit at Sengkang Connection, from the cash needed to secure it through to the monthly repayment once the loan is fully drawn. It follows the standard progressive payment schedule for an industrial unit bought under construction, applies 9% GST to every instalment, and computes Buyer's Stamp Duty on the commercial and industrial scale.

It is built for industrial purchases specifically, using that staging, the commercial and industrial duty scale, and GST on every instalment. See the payment scheme page for the schedule in narrative form and the stamp duty and GST page for the statutory position. For duty on its own, use the stamp duty calculator.

Pricing will be released by the developer. Until then the calculator opens at an illustrative $1,500,000 so the figures compute on load. That number bears no relation to Sengkang Connection, whose price list follows from the developer — see the pricing page. Enter your own figure to model a purchase.

Print or save this estimate as a PDF.

Purchase details

Figures update as you type.

90% is generally offered to an operating company taking the unit for its own use. Investment purchases are usually capped nearer 80%.

Check the rate that applies after the lock-in ends, not just the headline rate.

Used only for the property tax estimate at the foot of the page.

The first eight weeks

Add a booking date to turn the week numbers into dates.

    Loan summary

    At the loan-to-value selected on the left.

    Purchase price
    —
    Bank loan
    —
    Your contribution
    —

    Payment breakdown, weeks 0 to 8

    GST is charged on each instalment as it falls due, not once at the end.

    Cash needed to secure the unit

    Your own funds only. Anything the bank draws down is excluded.

    Total cash due within 8 weeksBefore construction begins
    —

    This is upfront cost only. The construction instalments below are drawn down by your bank as each stage completes, with the GST on each one payable in cash.

    Progressive payment schedule

    Timelines are indicative and set by construction progress, not by calendar dates.

    Swipe sideways to see the full table

    StageTimeline% InstalmentGST 9% Your cashLoan drawnLoan % InterestPrincipalRepayment

    Monthly repayment

    Once the loan is fully drawn.

    Full monthly instalment
    —

    During construction you pay interest only on what has been drawn so far, so the amount climbs stage by stage — see the two right-hand columns above.

    Property tax estimate

    Payable from TOP onwards. Nothing is levied during construction.

    Estimated annual rent
    —
    Unit size
    —
    Annual tax at 10%
    —

    This asset class is taxed at a flat 10% of Annual Value. IRAS sets the Annual Value from market rents for comparable units — the rent figures here are your own estimate, not an assessment.

    How the Sengkang Connection Calculator Works

    Buyer's Stamp Duty is computed on the commercial and industrial scale — 1% on the first $180,000, 2% on the next $180,000, 3% on the next $640,000, 4% on the next $500,000 and 5% above $1.5 million — applied to the price before GST. No Additional Buyer's Stamp Duty arises on this purchase.

    GST at 9% is applied to each progressive instalment as it falls due rather than once at the end, and it follows what is owed to the developer, not what you personally fund. At a higher loan-to-value the developer is still owed the full 20% during the S&P period, so GST on that 20% remains payable in cash.

    Loan disbursement begins after the S&P period, so the monthly repayment shown against each stage is the full-tenure amortisation of the cumulative amount drawn to that point. It climbs through construction rather than starting at its final level.

    What Governs the Loan-to-Value on a Sengkang Connection Unit

    There is no MAS loan-to-value ceiling on an industrial purchase — each bank sets its own limit, driven mainly by intended use, the borrower's financial position and the valuation. Owner-occupiers are treated most favourably, since the bank is lending against a business that will occupy and maintain the premises.

    The prescribed payment schedule governs what the buyer owes the developer at each construction stage, not who supplies the funds. Where a facility above the stage sum is granted, the bank draws the excess at completion of the sale once the mortgage is in place. Below 80% the loan exhausts and later stages revert to cash — the schedule shows this in the "Your cash" column rather than over-disbursing.

    Speak to your banker early so the loan tenure is set against the lease from the outset. The industrial loan page sets out how lenders approach an industrial purchase.

    When GST on a Sengkang Connection Purchase Can Be Claimed Back

    GST recovery is not something that can be determined from the outside — it turns on the buying entity and its own circumstances. As a general guideline, and subject to the rules set by IRAS, two situations are commonly distinguished.

    Where the buyer is an operating company. If the entity is GST-registered and already carrying on taxable business activities, the general guideline is that GST on the purchase may be claimed as input tax as it is incurred through the construction period.

    Where the buyer is a non-operating company. If the entity is newly incorporated, or an investment-holding company not yet carrying on taxable activities, the general guideline is that claims would not usually begin during construction. They may instead start once the property reaches TOP and operating activities commence — for example leasing the units out as a taxable supply, or operating the business from the premises.

    Both are guidelines rather than determinations, and the position in any particular case is subject to the rules set by IRAS. Confirm yours with IRAS or a tax adviser before committing.

    Other Costs to Budget for at Sengkang Connection

    Alongside the figures above, budget for fitting out, valuation and bank fees, and mortgage duty on the loan documents. Owner-occupiers moving from leased premises should also plan for the overlap with existing rent during construction — the Sales Concierge can help map the full timeline.

    The property tax estimate assumes a rent you supply and applies the flat 10% of Annual Value that applies to this asset class. IRAS sets the Annual Value from market rents, and nothing is levied during construction — property tax starts at TOP.

    Sengkang Connection Purchase Calculator: Frequently Asked Questions

    How much cash do I need to secure a unit at Sengkang Connection?

    During the eight-week S&P period the developer is owed 20% of the purchase price, plus 9% GST on that amount, plus Buyer's Stamp Duty and legal fees. GST is payable in cash — banks do not finance it. Enter your figures in the calculator above and the cash-to-secure block breaks the components out before the total.

    Can I borrow more than 80% on a unit that is still under construction?

    Yes. A 90% facility is available on an industrial purchase where the bank is satisfied with the borrower and the valuation. The prescribed payment schedule governs what you owe the developer at each stage, not who supplies the funds — the bank draws the excess above the stage sum at completion of the sale, once the mortgage is in place. Loan-to-value is set by each bank; there is no MAS cap on an industrial purchase.

    When can the GST on the purchase be claimed back?

    This turns on the buying entity and cannot be determined in general terms. As a guideline only, where the buyer is an operating company that is GST-registered and already carrying on taxable business activities, GST may be claimed as input tax as it is incurred. Where the buyer is a non-operating company, such as a newly incorporated or investment-holding entity, claims would not usually begin during construction and may instead start once the property reaches TOP and operating activities commence. In every case the position is subject to the rules set by IRAS.

    Discuss Your Sengkang Connection Numbers

    These are indicative estimates. For a figure specific to your business, its financing position and the unit you have in mind, speak to the Sales Concierge directly.

    Make an Enquiry Register Your Interest